Total Protection’s task was to provide a highly durable decorative surface that could be easily maintained and would retain its quality for many years to come.
This five phase project incorporated major upgrades to improve insulation, fire protection, anti-slip surfaces, anti-graffiti coatings and general redecorations.
Specialist slab paving and major block paved access roads to clearly demarked ambulance access routes and resin bound aggregate pathways.
Upgrade of the seafront walkways with a new decorative surface utilising the Addastone resin bonded gravel system.
A major new pavement installation project upgrading all of the existing pathways within this vital public park for the local area.
A much needed facelift for a large residential estate in the Shoeburyness area of Southend-on-Sea. A high quality and durable finish was required that minimised cost and disruption to the residents.